water meter relocated to the outside of the new wall

floor for extension at the back almost done

ceramics tiles for the stair case delivered
delivered

setting up for mending of cracks on third floor exterior wall

wire have to be run before the ceiling board is installed

laying of electrical wire for down light (16)

flooring almost done need the location of washing machine to make drainage pipe and power socket