Saturday, August 01, 2009

Day 6 , 1st August Saturday



water meter relocated to the outside of the new wall













floor for extension at the back almost done














ceramics tiles for the stair case delivered
delivered













setting up for mending of cracks on third floor exterior wall








wire have to be run before the ceiling board is installed









laying of electrical wire for down light (16)













flooring almost done need the location of washing machine to make drainage pipe and power socket