Tuesday, August 25, 2009

29 August

29 August 2009


Watching The Proposal together unplanned





25th August 2009



most of renovation done and the clearing of the debris started

the contractor say not charging for the painting for the external wall but it is brown.











vinyl tiles laying going quite fast













Panasonic exhaust fan installed

heaven or earth?

A refreshing development in evangelical theological studies is the new emphasis on the “new earth.” Refreshing to me in particular because of the “Beam me up, Lord” mentality of my generation, a mindset that concentrated on the Rapture of the Church and the Second Coming of Christ. It was heaven-centered, but focused on an ethereal heaven that we would either be “raptured” into alive or the souls our dead bodies had inhabited would be resurrected into. It was somewhere out there; but where was “there”?

As a boy that uncertainty plus the belief I got at church that we would spend eternity singing worship songs in heaven sure didn’t make me look forward to it. I enjoyed catching crawdads, frittering away hours in farmer Kelly’s woods, playing “kick the can” with my friends, and just hanging around at home smelling supper and reading Sugar Creek Gang books. That nagging fear of being bored to death with heaven hung on well into adulthood, but I never talked about it. It seemed ungodly and un-Christian.

That’s why the realization I came to a couple decades ago kindled a new hope in my heart—the understanding of the biblical promise that heaven was going to come to earth, and the earth be redeemed by “the Lamb who was slain” (Revelation 5) and would be refreshed (Acts 3:19), reunified Ephesians 1:9-10), restored (Acts 3:20), reconciled to God (Colossians 1:20): the joyous “Five Rs” of our future existence on God’s good earth!


Our temporary stay in heaven—what theologians call the intermediate state—is not the primary focus of Scripture. There are only a few verses that allude to it. Scripture is relatively silent on our intermediate state in heaven because it is not the Christian hope. The Christian hope is not merely that our departed souls will rejoice in heaven, but that, as 1 Corinthians 15 explains, they will reunite with our resurrected bodies.

And where do bodies live? Not in heaven: That’s more suitable for spiritual beings like angels and human souls. Bodies are meant to live on earth, on this planet. So the Christian hope is not merely that someday we and our loved ones will die and go to be with Jesus. Instead, the Christian hope is that our departure from this world is just the first leg of a journey that is round-trip. We will not remain forever with God in heaven, for God will bring heaven down to us. As John explains his vision in Revelation 21:1-4, he “saw the Holy City, the new Jerusalem coming down out of heaven from God” to the earth, accompanied by the thrilling words, “Now the dwelling of God is with men, and He will live with them.”

In short, Christians long for the fulfillment of Emmanuel, the divine name that means “God with us.” We don’t hope merely for the day when we go to live with God, but ultimately for that final day when God comes to live with us

Saturday, August 22, 2009

day 26, 21 August

sink tap install














water heater / shower install













hand washing basin install

Wednesday, August 19, 2009

19 august 2009



Acrylic sheets up on the 3rd floor metal grille














patch up of no.27 HOLE above copier













3rd floor toilet tiling done
















painting done at 3rd floor












aluminum door installing

Thursday, August 13, 2009

Day 18 13 August 2009

more painting work past 2 days
front gate paint job completed
3 coats of paint

2nd and 3rd floor painting is ongoing














2nd floor toilet bi-fold door install















partition at 1st floor separating the toilet/kitchen area

tomorrow the aluminium sliding door will be installed










Owner ask his own workers to redo toilet floor at 3rd floor, started work today

Monday, August 10, 2009

Day 15, 10 August 2009


Yesterday Sunday not much action only 2 workers fixing the gate at
the back.
Relocation















today .... aluminium door and wall hack out














painting of the front metal gate















painting of the wall

Saturday, August 08, 2009

day 13 Saturday Sabbath 8 August

frustration the roof is up and
wire mesh end up same problem after telling them over and over......argghhhh


Friday, August 07, 2009

Day 12, 7th August 2009


frame for the roof being installed















PLN came to upgrade the power to 50 amp also connect for the 10mm wire for no.27 shop













painting of the ceiling
















water pipes laying

Thursday, August 06, 2009

Day 11 , 6th August 2009



the sink and stove area
the default height of stove area is shorter

























the downlights were installed
good..












air-con condensing unit installation today but the trunking work was terrible ask them to redo







staircase ceramic tile completed

Wednesday, August 05, 2009

Day 10 5th August 2009







delivery of Aircon







installation of aircon















installing down lights





























FABRICATING KTCHEN SINK TOP AND SUPPORT

Tuesday, August 04, 2009

Day 9 , 4 August , Tuesday



glass panel without the door pending door will be last item to installed











plaster ceiling board mounting work started after the electrical cables are laid
last 2 days







cornices installation







Monday, August 03, 2009


Day 8 , 3rd August, Monday





installation of aluminium glass panel for the front entrance.
partially completed.











Laying of ceramic tile for stairways















laying tiles for the 2 floor sink top

Saturday, August 01, 2009

Day 6 , 1st August Saturday



water meter relocated to the outside of the new wall













floor for extension at the back almost done














ceramics tiles for the stair case delivered
delivered













setting up for mending of cracks on third floor exterior wall








wire have to be run before the ceiling board is installed









laying of electrical wire for down light (16)













flooring almost done need the location of washing machine to make drainage pipe and power socket